Správa železnic will secure another 130 level crossings this year, the costs should reach CZK 1.6 billion. Thanks to the continuous increase in safety at level crossings, the number of accidents has been reduced, with the lowest number of accidents in 5 years in 2024. A new campaign warning drivers against risky behaviour should also contribute to this positive trend.
Preparation of transport infrastructure projects funding from European funds after 2020, better collection of outstanding toll and preparation of high-speed rail lines connecting Poland, the Czech Republic, Slovakia and Hungary. These were the topics for the meeting between the V4 transport ministers in Bratislava.Slovakia and Hungary. These were the topics for the meeting between the V4 transport ministers in Bratislava.